by NIMBYkiller
They claim the real reason for the "new" station is b/c it would be too steep and costly to try to connect the ESA tracks with the existing GCT tracks. Whether or not this is true, I don't know.
However, if using any existings tracks at GCT was possible, I'd say MN should give LIRR the GCT lower level, and then just convert the 3rd rail at THOSE tracks to LIRR 3rd rail.
However, if using any existings tracks at GCT was possible, I'd say MN should give LIRR the GCT lower level, and then just convert the 3rd rail at THOSE tracks to LIRR 3rd rail.