 #1641814  by MBTAVideoClips
 
I heard something over my scanner earlier. Something about a train on track 13 at South Sta having its alarm going off with it potentially having something to do with the engine. It seemed like it was a doubleheader too. Was this 1033/1029 testing & failing?
 #1641975  by Commuterrail1050
 
1033 is assigned south, so it might have been that with another engine. 1029 is still in testing which it isn’t likely it. They would never test 2 rebuilt as a doubleheader together. It’s one with an older in service loco.
 #1641989  by MBTA F40PH-2C 1050
 
1033 is still OOS it is NOT in revenue service. HAS NOT passed its ACSES/PTC and seatbox tests. Hasn't turned a wheel in several days, still sitting in Readville at the bunter plugged into layover ground power

1029 should be at Area 52 with Mass Coastal for set up