Railroad Forums 

  • F40PH-3C overhaul program

  • Discussion relating to commuter rail, light rail, and subway operations of the MBTA.
Discussion relating to commuter rail, light rail, and subway operations of the MBTA.

Moderators: sery2831, CRail

 #1640961  by alasgw
 
MBTA 1029 has been completed at Erie and may may have shipped already
 #1641076  by jwhite07
 
1029 is on M436 Selkirk-Framingham today (3/23/24) per the B&M Live railcams; passed Chester 11:51AM and Westfield 12:21PM.
 #1641118  by GP40MC1118
 
It should go out tonight, but that all depends when M436 landed in Framingham. It would have to be switched out and added
to the local's consist.
  • 1
  • 65
  • 66
  • 67
  • 68
  • 69