Railroad Forums 

Discussion relating to the operations of MTA MetroNorth Railroad including west of Hudson operations and discussion of CtDOT sponsored rail operations such as Shore Line East and the Springfield to New Haven Hartford Line

Moderators: GirlOnTheTrain, nomis, FL9AC, Jeff Smith

 #848959  by DutchRailnut
 
would you like the color of their underware ??
 #849760  by Train2009
 
At 2:24 PM in Tarrytown the Inspection Train equipment move came by pulling by GP35 #103 as the cars are headed over to the other side of the river for this upcoming Friday's Run on the WOH Inspection train.
 #849777  by DutchRailnut
 
Croton-harmon to MO Jct, to New Rochelle, then via Amtrak to NJ, where NJT will bring it in MMC.
 #849814  by DutchRailnut
 
absolutely not, With MTA broke the New Inspection train may never happen.
 #850015  by cruiser939
 
DutchRailnut wrote:Croton-harmon to MO Jct, to New Rochelle, then via Amtrak to NJ, where NJT will bring it in MMC.
It came through Secaucus last night some time around 11:30pm or so on track B with an AEM-7 pulling.
 #850380  by railmason357
 
Usually leaves between 8A -830.

If it goes like it has in the past:

Goes out with three engines to Woodbine, one cuts off and goes to the east end and then goes back to Pascack Jct, single engine cuts off and then it goes up the tier to Pt Jervis. Run around and then back to Hoboken.
 #850460  by Train2009
 
Train2009 wrote:What time will the Inspection train running?
When it will be coming by Suffern on Friday?
 #850941  by DutchRailnut
 
read word before never, and think.

tomorrows power will be 4906-4908 plus a NJT unit on rear for reverse move.
 #851046  by SecaucusJunction
 
Is anyone going to be riding on the inspection train today like we had in previous years? If so, drop me a note... I'd love to hear anything that they talked about.
  • 1
  • 13
  • 14
  • 15
  • 16
  • 17
  • 24