jb9152 wrote:superbad wrote:is there anything new on the rumor of amtrak wanting to use the SS corridor to get into chicago and if amtrak did that the upgrades would be on their dime? Obviosuly if amtrak were to make a perminant switch the whole SS line w of mc would be double tracked, trippled in some places?
The cost is probably prohibitive at this time.
doing that would have work in skips and jumps to keep the cost down.
Since they have their own line that already makes it a sort of double track sense, so doesn't sound needed.
I tend to think the original line built was designed with how the traffic was working, double tracking at Gary. What would make sense is extending passing sidings making a sort of pseudo double track.
Portions of the right of way might not let it double track all the way, not without major workings. Out in the cornfield areas, sure.