• F40PH-3C overhaul program

  • Discussion relating to commuter rail, light rail, and subway operations of the MBTA.
Discussion relating to commuter rail, light rail, and subway operations of the MBTA.

Moderators: sery2831, CRail

  by Red Wing
 
1026 inbound on the Fairport, New York camera at 15:08
  by MBTA F40PH-2C 1050
 
1074 scheduled to be picked up from the G&U Thursday
1051 being added to the 2029/1816 set today
  by GP40MC1118
 
No news on the 1069 or anything else in Erie. The 010 has been in and out of the shop.
  by johnpbarlow
 
Here's a Palmer live cam screen grab of CSX Q436 hauling MBTA 1026 east at 1850 Monday 1/31/22.
You do not have the required permissions to view the files attached to this post.
  by CRail
 
MOD NOTE: Folks with information will post such when they have it. It is unnecessary to create posts asking for information regularly provided. Once again, this is not a chat room! Posts which do not contain pertinent information have been and will continue to be removed.
  by JacobKoppel
 
MPI Warranty Repairs: 1074 is on GU-1 today to be brought to Milford after getting warranty repairs from MPI in the Grafton & Upton shop.

There is a Keolis extra that will run down to Milford today to pick up the repaired 1074 and bring it back to Readville.
  by BandA
 
What engine facilities does the G&U have?
  by GP40MC1118
 
They got a new engine house just south of the yard at North Grafton. Not sure if it went up in 2020 or 2021.
  by Commuterrail1050
 
What was the issues that 1074 had in the first place to get repaired there? Also, what common issues does some of these rebuilds comes back with?
  by JacobKoppel
 
1026 has finally made it to Middleboro... Begin the testing process!
  by Commuterrail1050
 
I’d like to know when they usually start the cab signaling testing. Not familiar with how the testing process works here, but I know that they start on the cape main. Not sure if that changed because of all the cab cars rebuilt. I know they used to test both here at the same time.
  by GP40MC1118
 
Cab Signal testing usually happens a few days after each unit is delivered to Readville off an extra from Middleboro. And that doesn't happen until the MBTA "accepts" the unit in Rochester. In other words. CSX delivers it to Middleboro. Mass Coastal takes it to Rochester. Once accepted, Mass Coastal brings it back to Middleboro. The MBTA, usually once a week or two, runs an extra from Readville to Middelboro and return. This is how it gets to Boston.
  by Commuterrail1050
 
Does anyone know what’s going on with 1025? It’s been listed as in testing for quite a while now and there hasn’t been any confirmed sightings anywhere.
  by CRail
 
Readville switcher brought it to BET last night.
  by DCatrambone6337888
 
Any reports of what's going on with 1057? Still on the G&U?
  • 1
  • 51
  • 52
  • 53
  • 54
  • 55
  • 69