 #1590937  by johnpbarlow
 
Here's a Palmer live cam screen grab of CSX Q436 hauling MBTA 1026 east at 1850 Monday 1/31/22.
Attachments:
CSX Q436 with MBTA 1026 night Palmer 013122 2.JPG
CSX Q436 with MBTA 1026 night Palmer 013122 2.JPG (67.53 KiB) Viewed 1694 times
 #1590985  by CRail
 
MOD NOTE: Folks with information will post such when they have it. It is unnecessary to create posts asking for information regularly provided. Once again, this is not a chat room! Posts which do not contain pertinent information have been and will continue to be removed.
 #1591005  by JacobKoppel
 
MPI Warranty Repairs: 1074 is on GU-1 today to be brought to Milford after getting warranty repairs from MPI in the Grafton & Upton shop.

There is a Keolis extra that will run down to Milford today to pick up the repaired 1074 and bring it back to Readville.
 #1591319  by Commuterrail1050
 
I’d like to know when they usually start the cab signaling testing. Not familiar with how the testing process works here, but I know that they start on the cape main. Not sure if that changed because of all the cab cars rebuilt. I know they used to test both here at the same time.
 #1591321  by GP40MC1118
 
Cab Signal testing usually happens a few days after each unit is delivered to Readville off an extra from Middleboro. And that doesn't happen until the MBTA "accepts" the unit in Rochester. In other words. CSX delivers it to Middleboro. Mass Coastal takes it to Rochester. Once accepted, Mass Coastal brings it back to Middleboro. The MBTA, usually once a week or two, runs an extra from Readville to Middelboro and return. This is how it gets to Boston.
 #1591569  by CRail
 
Readville switcher brought it to BET last night.