With the retirement of the CTC system between Hermon (Northern Maine Jct) and Benton, did the former CPF66, CPF90, CPF92, CPF93, CPF107, and CPF109 locations get new names, or are they still called "CPF.." even though they're no longer actually control points? At least a few of those were places where the number of tracks changed, so I would assume there would still be a need to refer to them as actual locations on a Form D, but I know things on the railroad don't always follow the logic you think they would.
Thanks
Joshua
Thanks
Joshua