A spate of window-smashing could result in service cuts on the Flushing Line. The MTA faces a possible glass shortage from the vandalism spree. More than 400 windows have been broken since May; repair costs have exceeded $250,000. Two more ❼ trains suffered window damage overnight.
Please keep hands off the door