by nomis
AFAIK, Only 2 weekends in August so far are bustituted, due to CP-6 signal construction and crossover.
Moderator: Railroad.net/forums
Avatar: An overnight trip on Girard Ave. stumbles upon 6 PCC's and an LRV stuck within two blocks.
Avatar: An overnight trip on Girard Ave. stumbles upon 6 PCC's and an LRV stuck within two blocks.