• POED / EDPO (Portland - East Deerfield trains)

  • Guilford Rail System changed its name to Pan Am Railways in 2006. Discussion relating to the current operations of the Boston & Maine, the Maine Central, and the Springfield Terminal railroads (as well as the Delaware & Hudson while it was under Guilford control until 1988). Official site can be found here: PANAMRAILWAYS.COM.
Guilford Rail System changed its name to Pan Am Railways in 2006. Discussion relating to the current operations of the Boston & Maine, the Maine Central, and the Springfield Terminal railroads (as well as the Delaware & Hudson while it was under Guilford control until 1988). Official site can be found here: PANAMRAILWAYS.COM.

Moderator: MEC407

  by WN&P
 
newpylong wrote:Anywhere they have blocks for that day - Gardner, Fitch, Ayer, NC (for Nashua), Lowell, Lawrence, Dover, Rockingham.

They do not work businesses.
I'm assuming it must take them two crews to get from E. Deerfield to Portland with all that work?
  by MEC407
 
Video by Derek Carpine:

https://www.youtube.com/watch?v=ipCuD-CRUfo" onclick="window.open(this.href);return false;
  by gokeefe
 
I don't recall seeing lit number boards before. Is that something they're bringing back?
  by MEC407
 
They never went away. :-)

The bulbs do burn out and occasionally a crew might forget to turn them on, but generally you're going to see them lit at night.
  by atholrail
 
EDPO today had 370-606-601-504 and 26 cars out of Deerfield. Must have had some problems at the yard as they only made it as far as Athol before recrewing.

POED today had the 519-501-600-507 and 84 cars out of Gardner. AYED crew.
  by MEC407
 
Video by Dan Comick:

https://youtu.be/csneuMRdXW0?t=1m5s" onclick="window.open(this.href);return false;
  by Z31SPL
 
EDPO is all messed up right now, stopped short of Rockingham Junction at Swampscott Street waiting for a maintainer. With cables hanging off of one the engines. Causing major delays for multiple Downeasters.
  by Z31SPL
 
I heard later that evening that POED also had some problems around Plaistow and had to limp to Lawrence.
  by gokeefe
 
Z31SPL wrote:EDPO is all messed up right now, stopped short of Rockingham Junction at Swampscott Street waiting for a maintainer. With cables hanging off of one the engines. Causing major delays for multiple Downeasters.
All the more reason to restore full double track in the future.
  by atholrail
 
EDPO blew thru Shirley at 1225 with 606-517-600 and a big train of 95 cars..lots of NS gons, unsure whats in them?
Last edited by atholrail on Thu Feb 18, 2016 6:57 pm, edited 1 time in total.
  • 1
  • 2
  • 3
  • 4
  • 5
  • 8