  by ajp
 
curious what it is since it is blocked from floor to ceiling on the main level. It doesn't extend to the lower level.
  by DutchRailnut
 
is that not were zaro's was ?
  by ajp
 
the construction is block half the hallway under the arch leading to the Lexington avenue passage Zaros there was towards the 18/19gate.
I'll look today of that Zaros is involved also.
  by mkm4
 
Probably the floors, like they did just before this by track 33
  by Ridgefielder
 
Walked past there last night. Zaro's isn't involved-- it's still there. The temporary wall is between Zaros and the Track 22-23 gate, under the arch.
  by ajp
 
this morning the blockage was on the staircase side, leaving the track gates free. It appears they are patching the ceiling, if one looks at the fresh paint uo there
  by DutchRailnut
 