As most of you may be aware, Rotem had a contract to overhaul 22 SEPTA push-pull trailer coaches. SEPTA had previously done three of them at Frazer, and were doing the cab cars in-house at Frazer as time permitted. Recently, the contract was expanded to include the 10 center-door cars (not 11 as stated in various media, as that would equal 1 car more than SEPTA has in the fleet).
This is a list of the cars that have not yet been overhauled, based on personal observation of the operating fleet and what has been cycling through the CSX Greenwich Yard. Due to missing one trainset in my observations yesterday, I have a question on the status of one car, so until I see otherwise, I will count it as not having been overhauled.
Info is current as of 4/26/16.
Cab control coaches not yet completed (work done by SEPTA at Frazer):
2402-2407, 2409-2410
Trailer coaches not yet completed:
2520-2521, 2550-2559**
**2550-2553 currently at Rotem for overhaul as of 4-22-16
This is a list of the cars that have not yet been overhauled, based on personal observation of the operating fleet and what has been cycling through the CSX Greenwich Yard. Due to missing one trainset in my observations yesterday, I have a question on the status of one car, so until I see otherwise, I will count it as not having been overhauled.
Info is current as of 4/26/16.
Cab control coaches not yet completed (work done by SEPTA at Frazer):
2402-2407, 2409-2410
Trailer coaches not yet completed:
2520-2521, 2550-2559**
**2550-2553 currently at Rotem for overhaul as of 4-22-16