by UN Block
And another tower question!
When the control of switches and signals from B Tower at Bethpage Junction ended on April 27, 1987, was the new Beth Interlocking controlled ONLY from the local control panel in B Tower?
I presume (!) that the US&S Model 14 machine was STILL controlling PW Interlocking until Farm 2 to Brent went live on September 14 of that year?
Help!
When the control of switches and signals from B Tower at Bethpage Junction ended on April 27, 1987, was the new Beth Interlocking controlled ONLY from the local control panel in B Tower?
I presume (!) that the US&S Model 14 machine was STILL controlling PW Interlocking until Farm 2 to Brent went live on September 14 of that year?
Help!