by Passenger
The Red Line subway station is already 100% accessible. However, there is already pedestrian passageway completely under the Green Line L, albeit outside fare control.
So the minimum necessary to accomplish 100% accessibility would be adding two elevators outside fare control from the pedestrian tunnel under Lake Street to each of the L platforms.
Technically feasible without major reconstruction?
What about politically feasible? Isn't 100% accessibility some sort of official ultimate goal?
So the minimum necessary to accomplish 100% accessibility would be adding two elevators outside fare control from the pedestrian tunnel under Lake Street to each of the L platforms.
Technically feasible without major reconstruction?
What about politically feasible? Isn't 100% accessibility some sort of official ultimate goal?