by Clearfield
MACTRAXX wrote:I thought that the Summer 2002 Rail Power Project replacing all wires in the 30th Street Station - Suburban Station area would result inUnfortunately, raising the clearances everywhere on the railroad won't fix the clearance problems that were 'designed' into the tunnels. There's just no room to raise the cat in some areas without undercutting the track bed.
increased overhead clearances - instead I believe the same clearances were kept-precluding the use of F40 units through the CC Tunnel...
This is the same reason we can't upgrade to 25KV - the 25KV insulators are larger (longer) and the cat clearance would be even lower than it is now.
I'm sure that during design, an engineer calculated the additional cost to raise the cat one inch throughout the tunnel project. Multiply that number by the number of inches we would need and the cost goes way up. Hindight is ALWAYS 20/20
"The needs of the many, outweigh the needs of the few, or the one".............. Spock