by MBTA1
While riding the E Line home tonight from the Mall my train came upon a disabled 3681 just after Symphony. My car 3715 was brought in to boost 3681 with apperently a jump start. (From what I could see 3681 had lost all power, air, electric, ect.) The idea of a jump start didn't work, which led to the idea of using 3715 to push 3681 up the incline. The car made it about half way up the incline when it stopped moving and threw on its track brake. After several failed attempts of resetting the train, car 3716 was brought in to help 3715 push 3681 up the hill. The operator and inspector on site decided to put 3715 in reverse and have 3716 push forward. This was succesful in getting 3681 up the hill. In all the procedure took about 35 minutes to complete.
Note to the moderators: If there is a specific category for this feel free to move it.
-Scott
Note to the moderators: If there is a specific category for this feel free to move it.
-Scott