RenegadeMonster
Posts: 553
Joined: Tue Mar 07, 2017 9:19 am

Re: Beverly Drawbridge Replacement

Post by RenegadeMonster » Fri Jul 07, 2017 6:18 pm

New announcement playing on the trains stating "During the Beverly Drawbridge construction use of the Salem Parking Garage is strongly discouraged due to congestion. Salam police will be enforcing all parking regulations."

Also, there is another one I heard earlier this week about bus during the drawbridge construction and PTC but the audio is so low compared to stop announcements you can only catch bits and pieces of it.

RenegadeMonster
Posts: 553
Joined: Tue Mar 07, 2017 9:19 am

Re: Beverly Drawbridge Replacement

Post by RenegadeMonster » Wed Jul 19, 2017 7:35 pm

First 2 days underway of the shut down.

The MBTA was bing nice to us on the Eastern tonight and handing out free bottled waters to all passengers who wanted one tonight when boarding at North Station.

Peoples first thoughts were "Does this mean the Air Conditioning isn't working?" as I heard asked several times. The MBTA staff just simply responded that the MBTA wanted to be "nice".

deathtopumpkins
Posts: 1035
Joined: Tue Aug 27, 2013 8:56 am
Location: Somerville, MA

Re: Beverly Drawbridge Replacement

Post by deathtopumpkins » Thu Jul 20, 2017 7:48 am

WCVB had a neat video taken via helicopter last night of the crane assembled over the drawbridge. Haven't seen it online anywhere, but if I find it I'll post it.
Call me Connor or DTP

Railfan & Roadgeek from the North Shore of Mass.

octr202
Posts: 4156
Joined: Fri Mar 12, 2004 8:13 am
Location: In the land of the once and future 73 trackless trolley.

Re: Beverly Drawbridge Replacement

Post by octr202 » Thu Jul 20, 2017 7:52 am

From the T itself:

https://twitter.com/MBTA/status/887984005349597184" onclick="window.open(this.href);return false;
Wondering if I'll see the Haverhill double-tracking finished before I retire...
Photo: Melbourne W7 No. 1019 on Route 78, Bridge & Church Streets, Richmond, Victoria. 10/21/2010

RenegadeMonster
Posts: 553
Joined: Tue Mar 07, 2017 9:19 am

Re: Beverly Drawbridge Replacement

Post by RenegadeMonster » Tue Jul 25, 2017 11:07 am

Looks like they are using this time of closure to do a lot tree work. Not just brush hogging but taking down whole trees along the tracks.

Also, what are the telephone poles for they are adding. Is that for PTC or WiFI?

GP40MC1118
Posts: 3641
Joined: Thu Mar 11, 2004 8:06 pm

Re: Beverly Drawbridge Replacement

Post by GP40MC1118 » Tue Jul 25, 2017 11:10 am

PTC

Wi-fi installation on hold due to towns system wide complaining about the WF towers...

D

tomytuna
Posts: 21
Joined: Mon May 15, 2006 12:57 pm
Location: Lynn, Mass

Re: Beverly Drawbridge Replacement

Post by tomytuna » Mon Aug 07, 2017 7:46 pm

Can someone/anyone tell me if/where I can find actual picture of this project? underway during construction? thanks Tommy
Tom

RenegadeMonster
Posts: 553
Joined: Tue Mar 07, 2017 9:19 am

Re: Beverly Drawbridge Replacement

Post by RenegadeMonster » Mon Aug 07, 2017 8:08 pm

There are a couple pictures in the tweet linked a few posts above.

deathtopumpkins
Posts: 1035
Joined: Tue Aug 27, 2013 8:56 am
Location: Somerville, MA

Re: Beverly Drawbridge Replacement

Post by deathtopumpkins » Tue Aug 08, 2017 7:56 am

Looks like the T is taking advantage of the shutdown to get some other work done too... was in Ipswich yesterday and saw the entire low platform was freshly repaved.
Call me Connor or DTP

Railfan & Roadgeek from the North Shore of Mass.

RenegadeMonster
Posts: 553
Joined: Tue Mar 07, 2017 9:19 am

Re: Beverly Drawbridge Replacement

Post by RenegadeMonster » Tue Aug 08, 2017 8:13 am

yeah, they have been real busy.

They have been doing a lot of tree clearing as well.

Speaking of work, PTC work is going on as well.

What I don't get is why at Salem Station did they put up telephone poles and a single wire when the power lines / existing signaling is underground. The poles look goofy placed along the metal inbound/outbound train markers. What's even odder is they appear to be burying the PTC line at River Works and running it with the exiting underground power/signal wires.

User avatar
BostonUrbEx
Posts: 3835
Joined: Thu Dec 03, 2009 9:55 pm
Location: Winn to MPT 8, Boston to MPN 38, and Hat to Bank

Re: Beverly Drawbridge Replacement

Post by BostonUrbEx » Tue Aug 08, 2017 5:56 pm

Stone-X with the 1026, 1062, C-1, and 26 loaded stone hoppers went over the Beverly Draw today. It was the first movement over the new span. They'll be dumping stone into tomorrow for all the tie job work that's been done.

User avatar
BandA
Posts: 2842
Joined: Thu Oct 11, 2012 11:47 am

Re: Beverly Drawbridge Replacement

Post by BandA » Thu Aug 10, 2017 1:11 am

RenegadeMonster wrote:yeah, they have been real busy.

They have been doing a lot of tree clearing as well.

Speaking of work, PTC work is going on as well.

What I don't get is why at Salem Station did they put up telephone poles and a single wire when the power lines / existing signaling is underground. The poles look goofy placed along the metal inbound/outbound train markers. What's even odder is they appear to be burying the PTC line at River Works and running it with the exiting underground power/signal wires.
Separate PTC & Wifi projects going on at the same time but not coordinated. Both installing fiber, one underground, one above ground. Example of incompetence and waste, and the Wifi towers are controversial as notice and public hearings processes were improper. I think there is another thread.

RenegadeMonster
Posts: 553
Joined: Tue Mar 07, 2017 9:19 am

Re: Beverly Drawbridge Replacement

Post by RenegadeMonster » Thu Aug 10, 2017 8:54 am

They moved some engines and cars this morning passed the Beverly Drawbridge and started putting sets together for Monday.

Looks like this is the end of the 6 & 7 car sets we have been seeing. Mostly only 4 car sets today and yesterday.

RenegadeMonster
Posts: 553
Joined: Tue Mar 07, 2017 9:19 am

Re: Beverly Drawbridge Replacement

Post by RenegadeMonster » Mon Aug 14, 2017 9:21 am

There are a few more good photos of work on the Beverly Drawbridge on this MBTA press release towards the bottom.

http://www.mbta.com/about_the_mbta/news ... nth=&year=" onclick="window.open(this.href);return false;

RenegadeMonster
Posts: 553
Joined: Tue Mar 07, 2017 9:19 am

Re: Beverly Drawbridge Replacement

Post by RenegadeMonster » Mon Aug 14, 2017 7:57 pm

Here is another good picture I just came across of the first train to cross the new bridge