by nysw136
Anyone notice that the track gang camp cars are back in Binghamton with a bunch of flats of track equipment? Not sure how long they've been there, but I did notice that one rail of Track 1 between Johnson and CP-217 has been switched from jointed rail to new welded rail dated 2010. Anyone know what the speed rating for the switch at CP-217 is? Track 1 speed is currently 25 so W/B's only get a medium clear, but if they raise Track 1 to 40mph, is limited clear a posssibility with the switch?
Kevin M.
Kevin M.