by Head-end View
Good to see the entire project proceeding efficiently. Those new steel poles are being erected now around Westbury Station on the north side of the tracks.
Railroad Forums
Moderator: Liquidcamphor
Pensyfan19 wrote: ↑Thu Jan 07, 2021 5:32 pm Does this track work include removing the last crossing in Mineola and possibly installing the third track itself?1.) Willis Avenue was closed on November 30th, and from recent pictures there is a giant pit in between the two crossings (Oyster Bay and Main Line). Another pit is located to the South of the construction site.
scopelliti wrote: ↑Wed Jan 20, 2021 11:37 am I agree, but that is what I was told. I guess eastbound trains would crossover twice from track 3 to 2, then track 2 to 1 at Nassau_1 before the Mineola station. Seems awkward, but then, a train crossing from track 3 destined for Oyster Bay would block all three tracks anyway.Actually the numbering of the tracks will change. Going from the North side of the ROW to South: