StefanW wrote:
"There was a significant presentation and discussion about the "West Station" project (along with the I-90 relocation) at the joint MBTA FMCB & MassDOT Board meeting."
https://mbta.com/events/1096" onclick="window.open(this.href);return false;
...and under the topic "The T's continuing effort and commitment to reduce the deficit and stop gouging taxpayers and our riders" we have: FMCB Briefing Page 29:
"Construction Phase Closure of GJR
•The GJR will be closed for 3 years(estimated) to construct either of the at-grade variations
•MBTA will utilize a 104 mile detour to transfer equipment between the south side and the CRMF in Somerville"
Wow, three years of deadheading equipment 104 miles (each way) on a daily/weekly basis...anyone know the location of the mother lode?
"There was a significant presentation and discussion about the "West Station" project (along with the I-90 relocation) at the joint MBTA FMCB & MassDOT Board meeting."
https://mbta.com/events/1096" onclick="window.open(this.href);return false;
...and under the topic "The T's continuing effort and commitment to reduce the deficit and stop gouging taxpayers and our riders" we have: FMCB Briefing Page 29:
"Construction Phase Closure of GJR
•The GJR will be closed for 3 years(estimated) to construct either of the at-grade variations
•MBTA will utilize a 104 mile detour to transfer equipment between the south side and the CRMF in Somerville"
Wow, three years of deadheading equipment 104 miles (each way) on a daily/weekly basis...anyone know the location of the mother lode?