What is the status of the new signal system? Any news or updates?
  by R36 Combine Coach
 
During the 2010 Harrison Shop tour it was mentioned a 2017 date.
  by 25Hz
 
5 years, not too bad considering it's basically a rebuild/replace of the existing system & the lines don't really shut down ever.
  by JCGUY
 
Is there any chance that Siemens can use the unfortunate 10-5 daily PATH outages to speed this up, at least along sections that haven't been flood damaged?
  by 25Hz
 
Sadly i think the priority is replacing existing and repairing what can be salvaged.

They prolly tried to take components out before the storm hit after revenue shutdown, knowing it was likely water would infiltrate.