While likely this inquiry has been made elsewhere at the Forum, but in light of Spuyten Duyvil, could someone with knowledge outline what train control systems presently exist through the MNR system, so that such is all available at one topic. Also of interest would be to what extent, if at all, would an existing system be considered compliant with 'Positive Train Control' under RSIA 08.
Example (and this may no longer be the case) New Canaan Branch is 'Timetable' and not compliant with PTC.
Thanks for the help; especially if such comes from those around here who are Rules Qualified and have access to an ETT.
Oh and a final off topic note. To 'graduate' from Third Grade at Cos Cob School, one was required to properly spell 'Spuyten Duyvil'.
Example (and this may no longer be the case) New Canaan Branch is 'Timetable' and not compliant with PTC.
Thanks for the help; especially if such comes from those around here who are Rules Qualified and have access to an ETT.
Oh and a final off topic note. To 'graduate' from Third Grade at Cos Cob School, one was required to properly spell 'Spuyten Duyvil'.