Is the east yard used for deliveries eastbound and west yard for Bushwick and LIC area?
Railroad Forums
Is the east yard used for deliveries eastbound and west yard for Bushwick and LIC area?
Did any passenger trains run across the bridge or was it freight only?
What RR company operates through Milton and where do the tracks go? How much traffic every day?
Todays Newsday has an article about the tower but it’s behind a paywall.
Was the model board in the tower saved?
Was in town today and saw a long string of white tank cars by the feed mill. Are they in long term storage?
Is the county now cooperating with the RR and are expansion plans on hold or off the table?
Do dual modes have to stop to change from electric to diesel mode? Or do they do it at speed?
How much would batteries weigh to power an m-7 set? That’s a lot of amps to use on a heavy rail car.
Does CP switch the plant or do they have a trackmobile to be spot cars. I know they have a yard outside the plant.
It’s been a long time since I’ve been on L I. Are the tracks still at grade level except where the previous elevations are?
Is the spur line that goes over route 5 in Amsterdam still in use?
Any one going to subscribe to the new website? Not sure if it’s worth the monthly price.
Any pictures of the work being done around Norton. I have a cousin in Norton so I’m familiar with the area .Stayed In a cabin opposite the post office this summer and had a great rail fan view. Tracks were right outside back window!
Cohoes isn’t too far down the line from Mechanicville so it’s possible it was done that same week. Thank you for the reply.