by Flat-Wheeler
Anchorman wrote: with the upswing in the economy and the new Patriot Corridor traffic the single track project is off!!! Good news!!! The new signal system is still on so if all goes as planned we'll have 261 signals and upgraded double track.The single track project between Waverly and Johnson (Binghamton) has had an emergency stop order to halt the project...in favor of a double track expansion project. Possibly double track re-installed all points West of the Route 400 highway overpass. 261 signals Waverly to Johnson. Currently there are 251 signals (in one direction).