• NYA MP15AC 159?

  • Discussion related to NYAR operations on Long Island. Official web site can be found here: www.anacostia.com/nyar/nyar.html. Also includes discussion related to NYNJ Rail, the carfloat operation successor to New York Cross Harbor that connects with NYAR.
Discussion related to NYAR operations on Long Island. Official web site can be found here: www.anacostia.com/nyar/nyar.html. Also includes discussion related to NYNJ Rail, the carfloat operation successor to New York Cross Harbor that connects with NYAR.
  by LINYARailfan
 
mwichten wrote:Not my photo, but the caption on Facebook said “In the consist of 18G this morning. Looks like shes on her way home after rebuild”. Credit to the photographer Joe Aziz.
F213855D-DF36-42AB-AAD5-ACCDBBFC5600.jpeg
When will the 159 be back in Fresh Pond? Also is the 151 next to be sent out for rebuild? If so when will the 151 be going out to Altoona for rebuild?
  by Backshophoss
 
That will depend on CSX NOT having it get rerouted at Selkirk's Black hole of a yard. :(
  by Teutobergerwald
 
Does the NYA also have the units that are sent to Altoona for rebuild repainted also? The pic of 159 is a good one- she looks sharp and the paint looks new. Is it? Thanks.
  by gregorygrice
 
Teutobergerwald wrote:Does the NYA also have the units that are sent to Altoona for rebuild repainted also? The pic of 159 is a good one- she looks sharp and the paint looks new. Is it? Thanks.
All rebuilt engines are/will be repainted.
  by LINYARailfan
 
What is the latest on the 159? Is she back in Fresh Pond yet? If so when will the 151 be sent out for rebuild if it hasn't been sent out already? I plan to go out to PA to see it on the move in the next few weeks if that is when it is scheduled to go out to Altoona. Thanks.
  by gregorygrice
 
LINYARailfan wrote:What is the latest on the 159? Is she back in Fresh Pond yet? If so when will the 151 be sent out for rebuild if it hasn't been sent out already? I plan to go out to PA to see it on the move in the next few weeks if that is when it is scheduled to go out to Altoona. Thanks.
Arrived at Pond a couple days ago. Still needs electronics installed.
  by gregorygrice
 
Photos of 159 post rebuild:

Glass End: http://www.railpictures.net/photo/683390/" onclick="window.open(this.href);return false;

Nose End: http://www.railpictures.net/photo/683391/" onclick="window.open(this.href);return false;

Cab Interior: http://www.railpictures.net/photo/683392/" onclick="window.open(this.href);return false;

Once again the locomotive still needs electronics (Cab signalling, ACSES, Witronix, etc) installed and needs to be tested before being released so please don't ask when it'll be out on the road.
  by LINYARailfan
 
Kind of a ridiculous question but does the 159 still have its original bell on the roof of the hood or does it now have an e-bell like the 300 and the 301?
  by Backshophoss
 
Warning,Rail pics put up a paywall, wants to force ads on you !!!! :( :( :(
  by Bad Luck
 
LINYARailfan wrote:Kind of a ridiculous question but does the 159 still have its original bell on the roof of the hood or does it now have an e-bell like the 300 and the 301?
The 159 received a replacement Nathan P3 and replacement mechanical bell from Juniata.