by johnpbarlow
The recent tour of the CWR train left behind some lengths of 136 pound rail at the Wellesley Hills station. Guessing it will be used to replace elderly 1952 era 127 pound rail? What does the MBTA do with the removed rail - does it get sold for scrap?
Track 2 looks pretty good with recent tie and ballast work.
Track 2 looks pretty good with recent tie and ballast work.
You do not have the required permissions to view the files attached to this post.