by jtbell
Charlotte has been working on a 1.5 mile starter segment of a proposed 10 mile streetcar line, running basically east and west, connecting with the LYNX Blue Line light rail at the Arena/CTC station. It's supposed to be finished sometime this year. Here are some pictures of the construction work during the past six months:
http://www.jtbell.net/transit/Charlotte/Streetcar/" onclick="window.open(this.href);return false;
http://www.jtbell.net/transit/Charlotte/Streetcar/" onclick="window.open(this.href);return false;