Discussion relating to the operations of MTA MetroNorth Railroad including west of Hudson operations and discussion of CtDOT sponsored rail operations such as Shore Line East and the Springfield to New Haven Hartford Line

Moderators: GirlOnTheTrain, nomis, FL9AC, Jeff Smith

  by Clean Cab
 
Yeserday afternoon as MN was running a test train over the newly cut in switches at CP 217 in New Rochelle, the train got it's pantographs entangled in the overhead wire instantly removing tracks 3 and 1 from service. The test train apparently got caught in a wire gap over one of the newly installed switches. MN had to run both eastbound and westbound trains on tracks 2 and 4 the rest of the day. Repairs should have been made to tracks 1 and 3 by this AM.