Railroad Forums 

  • LV-N&W hand-off at Tifft

  • Discussion related to the Lehigh Valley Railroad and predecessors for the period 1846-1976. Originally incorporated as the Delaware, Lehigh, Schuylkill and Susquehanna Railroad Company.
Discussion related to the Lehigh Valley Railroad and predecessors for the period 1846-1976. Originally incorporated as the Delaware, Lehigh, Schuylkill and Susquehanna Railroad Company.

Moderator: scottychaos

 #1580936  by KevinD
 
For the trains that made a direct hand-off between LV and N&W at Tifft, exactly what was the routing of these trains? How did they get from the LV to the N&W? Did they take the L&LE branch to the south into LV's facility at Tifft Jct and somehow jump over the PC tracks (how?) to get to the N&W? Or did they use N&W rights on EL from a connection near William St past SK yard and over CP Draw and into the N&W from the north end of the yard? Trains arriving at LV Tifft Jct terminal via the L&LE would arrive from the south pointing northward (in the wrong direction).
 #1580941  by TrainDetainer
 
Crossed over at Tifft Jct to the Erie to FW, then Buffalo Creek to River Bridge (DRAW)/NKP. There's a photo of the LV/NW power swap at Tifft Jct in the Trackside-Buffalo book. NKP/NW had trackage rights DRAW to Bison Yd from way back.