by walterconklin
Hello,
My friend Doug Relyea, who is laying track and placing scenery at Easton and Phillipsburg on the virtual Tristate route created for the Microsoft Train Simulator platform, sent me the following message:
"I'm curious when the two truss bridges for the road and trolley under the CNJ bridge were replaced with the concrete arch. And when the two story LV pass station was removed. I'm guessing the freight house was sunder the elevated tracks, by the freight cars on the river side ofthe elevated track. And all I was trying to do was figure out where the Morris canal crossed under the Bel Del."
Does anyone have any information to share regarding Doug's inquiries?
Thank you for your time.
Sincerely,
Walter
My friend Doug Relyea, who is laying track and placing scenery at Easton and Phillipsburg on the virtual Tristate route created for the Microsoft Train Simulator platform, sent me the following message:
"I'm curious when the two truss bridges for the road and trolley under the CNJ bridge were replaced with the concrete arch. And when the two story LV pass station was removed. I'm guessing the freight house was sunder the elevated tracks, by the freight cars on the river side ofthe elevated track. And all I was trying to do was figure out where the Morris canal crossed under the Bel Del."
Does anyone have any information to share regarding Doug's inquiries?
Thank you for your time.
Sincerely,
Walter