According to the local paper, the Bedford Gazette, the track has been opened south to PA 475. Crews cleaned up further southward to the Pogue bridge to prepare for re-laying rail:
https://www.bedfordgazette.com/news/loc ... 7aae5.html
The Foundation has to work with PennDOT to install crossing protection at PA475. According to the Gazette report the steelwork on the bridge is in good shape but it needs some masonry work.
Rebuilding beyond Saltillo is a really long-term plan because it involves two tunnels. Both were considered too dangerous to enter and LIDAR drones were flown in to map out their condition. Therefore Robertsdale will be disconnected from the operating part of the EBT for the foreseeable future.
The Friends group issued a February 2024 newsletter where they want to clear out the overgrowth and make the area at least walkable "...which will enable guests to see the bridge, the runaway track, the end of the scale track, and the freight house track." Late last year they brought in rail bikes, which "needed some work". (As in re-gauging?) It's an idea that I like because at least the rails are actually used instead of being paved over.