Search found 25 matches

by jamestrains1
Thu Jan 10, 2019 11:50 pm
Forum: Amtrak
Topic: Amtrak Gateway Tunnels
Replies: 1989
Views: 410319

Re: Amtrak Gateway Tunnels

Looks like a lot if wasted space under that Genesis that could be used to "future-proof" the new tunnels and allow for higher bi-level equipment in the near future. Anyone have similar diagrams of the East River tunnels? They will have to be rebuilt or replaced some day too. Although I am unable to...
by jamestrains1
Thu Jan 10, 2019 11:25 pm
Forum: Amtrak
Topic: Amtrak Gateway Tunnels
Replies: 1989
Views: 410319

Re: Amtrak Gateway Tunnels

One of the largest cost drivers of the project is the large amount (15) of cross passages. In particular, the cross passages that will be required mid-river are expected to be most costly and challenging as they involve ground freezing. HUDSON TUNNEL PROJECT Draft Environmental Impact Statement and...
by jamestrains1
Thu Jan 10, 2019 11:05 pm
Forum: Long Island Rail Road (LIRR)
Topic: LIRR Mainline Third Track Project
Replies: 504
Views: 132330

Re: LIRR Mainline Third Track Project

There will still be only two platforms at Mineola. For third track, yes. I’m asking whether or not that holds true in assessments of making OB into a shuttle — the new interlocking config at Mineola seems to beg that course of action. Below you can see the proposed track geometry for the connection...
by jamestrains1
Thu Jan 10, 2019 11:03 pm
Forum: Long Island Rail Road (LIRR)
Topic: LIRR Mainline Third Track Project
Replies: 504
Views: 132330

Re: LIRR Mainline Third Track Project

If you compare the first image with the last, you can see how the alignments differ between the current Expansion Project project and the early 2000's Mainline Corridor Improvement Project. These images are similar in size and style and should make the comparisons between the two projects easier to ...
by jamestrains1
Thu Jan 10, 2019 10:41 pm
Forum: Long Island Rail Road (LIRR)
Topic: LIRR Mainline Third Track Project
Replies: 504
Views: 132330

Re: LIRR Mainline Third Track Project

The first two images below are from design-builder's bid and show the Existing Alignment and the Final Alignment. The third image is an Early Alignment from the earlier Main Line Corridor Improvements Project circa 2006, please excuse the poor quality of this image as it scan of a printed image. Thi...
by jamestrains1
Thu Jan 10, 2019 10:28 pm
Forum: Long Island Rail Road (LIRR)
Topic: LIRR Mainline Third Track Project
Replies: 504
Views: 132330

Re: LIRR Mainline Third Track Project

The next few posts will be contain the construction stages that were proposed in the design-builder's bid. This will require a few posts to show, as attachments are limited to 3 per post. LIRR CONTRACT #6240 Design-Build Services for LIRR Expansion Project from Floral Park to Hicksville VOLUME 2 - P...
by jamestrains1
Thu Jan 10, 2019 10:26 pm
Forum: Long Island Rail Road (LIRR)
Topic: LIRR Mainline Third Track Project
Replies: 504
Views: 132330

Re: LIRR Mainline Third Track Project

The next few posts will be contain the construction stages that were proposed in the design-builder's bid. This will require a few posts to show, as attachments are limited to 3 per post. LIRR CONTRACT #6240 Design-Build Services for LIRR Expansion Project from Floral Park to Hicksville VOLUME 2 - P...
by jamestrains1
Thu Jan 10, 2019 10:16 pm
Forum: Long Island Rail Road (LIRR)
Topic: LIRR Mainline Third Track Project
Replies: 504
Views: 132330

Re: LIRR Mainline Third Track Project

The design-build contractors had proposed an optimized alignment in their bid, which would simplify construction and reduce the amount of track that would need to be cut and thrown during construction. The optimized alignment would place the new track south of the existing two tracks for the majorit...
by jamestrains1
Thu Jan 10, 2019 9:38 pm
Forum: Long Island Rail Road (LIRR)
Topic: M9 and M9A Procurement & Acceptance
Replies: 651
Views: 131169

Re: M9 and M9A Procurement & Acceptance

geico wrote:Any update on when we might see these in real service? Or is the current generation of commuters going to retire first?
Are you speaking of the M9 or the M9a?

Depending on which you are referring to, the answer could very well be what you suggested.
by jamestrains1
Thu Jan 10, 2019 9:25 pm
Forum: Long Island Rail Road (LIRR)
Topic: LIRR Mainline Third Track Project
Replies: 504
Views: 132330

Re: LIRR Mainline Third Track Project

From information derived from documents released to the Village of Garden City, it appears as though the future track numbering will be as follows from north-most track to south-most track (current track number is italicized , and proposed track number is bold ): Existing Track ML1 Proposed Track ML...
by jamestrains1
Thu Jan 10, 2019 9:17 pm
Forum: Amtrak
Topic: Amtrak Gateway Tunnels
Replies: 1989
Views: 410319

Re: Amtrak Gateway Tunnels

Interesting Detail - New Tunnel Capacity Limitations due to NFPA 130 The new (Gateway) North River Tunnel tubes will have their inherent capacity limited due to strict adherence to National Fire Protection Association 130, which, among stipulating that that tunnels longer than 2,500ft require cross-...
by jamestrains1
Thu Jan 10, 2019 8:41 pm
Forum: Amtrak
Topic: Amtrak Gateway Tunnels
Replies: 1989
Views: 410319

Re: Amtrak Gateway Tunnels

The images below are from the Hudson Tunnel Project DEIS, they contain cross section images of the existing North River Tunnel, the proposed North River Tunnel, and the new (Gateway) North River Tunnel. Existing and Proposed Cross Section of current North River Tunnel HUDSON TUNNEL PROJECT Draft Env...
by jamestrains1
Thu Jan 10, 2019 8:31 pm
Forum: Amtrak
Topic: East River Tunnel Sandy Rehabilitation
Replies: 10
Views: 4272

Re: East River Tunnel Sandy Rehabilitation

Amtrak's North(Hudson)River tubes need to be DEMO'ed interior wise and rebuilt.like the L tunnels under the East River need to be done. IF and WHEN the Gateway goes online,each of the ex-PRR tubes is shut down,everything DEMO'ed and removed to the cast iron outer shell and rebuilt with new material...
by jamestrains1
Sat Apr 22, 2017 8:26 pm
Forum: Long Island Rail Road (LIRR)
Topic: MTA LIRR Double Track Project - Ronkonkoma to Farmingdale
Replies: 609
Views: 149169

Re: MTA LIRR Double Track Project - Ronkonkoma to Farmingdal

... Anybody know where the new Pinelawn Station is to be located? As described in the Environmental Assessment, the eastbound platform would be east of Wellwood Avenue (CR 3), the westbound platform would be west of Wellwood Avenue. An earlier design proposal considered locating both platforms east...
by jamestrains1
Sun Jan 29, 2017 1:54 am
Forum: Long Island Rail Road (LIRR)
Topic: Jamaica Reroute Scheme
Replies: 51
Views: 14280

Re: Jamaica Reroute Scheme

Jamaica Capacity Improvements Phase 2 Information Highlights from material sourced below: PHASE II - Construction - Part of future 2015- 2029 Capital Programs Phase II - Improve Jamaica Infrastructure -Increased train capacity -Improve interlocking by installing a higher speed track configuration -A...