Out of an average class of 14, how many conductors typically make it through the program?
Railroad Forums
Out of an average class of 14, how many conductors typically make it through the program?
Where in Hopewell is the facility?
*edit*
Never mind. Found it.
Yes, this was done yesterday. Traffic was stopped at the grade crossing on Rt 9 in Fishkill to let it pass. Sorry, no pics.
Assuming he was doing 75mph when he started to zone out, what would cause he rise to 82mph? Is that part of the line on a downgrade? If the throttle weren't increased, how long would it take the train to go from 75mph to 82mph?
Actually, the Beacon line was cleared of weeds and trees (from Irene and Sandy) all the way to Beacon.
The weeds and rather large trees (from Sandy and Irene) were cleared along the Beacon Line all the way to Beacon
Does anyone know if this is back on this year, or if it will ever be on again?