Railroad Forums 

  • RR Coal Delivery Issues hearing for Electric Generation FERC

  • General discussion about railroad operations, related facilities, maps, and other resources.
General discussion about railroad operations, related facilities, maps, and other resources.

Moderator: Robert Paniagua

 #1308269  by Ken W2KB
 
The Federal Energy Regulatory Commission ("FERC") regulates, among other things, the reliability of the Bulk Electric System (generating stations 20MVA and greater and electric transmission at 100kV and higher). FERC is very concerned that railroads are increasingly unable to effect timely deliveries of coal, especially Powder River Basin coal, needed to fire electric generating stations resulting in grid reliability concerns. Today at FERC's monthly agenda meeting, presentations on railroad coal operations were made by FERC staff, the STB and BNSF. I found some of the contents very interesting from a rail fan perspective. Here are links to the three presentations:

http://www.ferc.gov/media/headlines/201 ... -staff.pdf

http://www.ferc.gov/media/headlines/201 ... tation.pdf

http://www.ferc.gov/media/headlines/201 ... tation.pdf