by Leo Sullivan
This is testing my memory but, if I am correct, there was a short piece of track on the south side of the
bridge approach, about where the portal for the loops was but, to the south. It used to be an outside connection. That is where the cars were unloaded due to clearance limitiations on the rest of the line.
Note that there is no wire and, the man on the roof is affixing a "Bug" to move the car over to the running track.
bridge approach, about where the portal for the loops was but, to the south. It used to be an outside connection. That is where the cars were unloaded due to clearance limitiations on the rest of the line.
Note that there is no wire and, the man on the roof is affixing a "Bug" to move the car over to the running track.