by JCMDFCCP
I am interested in modelling the NYC in n scale and would like to include High Bridge yard. I am interested in the era around 1959-1965 prior to the Penn Central merger. Can somebody give me some specifics about the function and operation of High Bridge yard. I know that it was used as an "overflow" for passenger equipment but was it also used as a freight yard? How was it laid out: were the tracks used as classification tracks? Was freight equipment separated from passenger equipment? Were local industries serviced from the drill tracks? Does anyone have a track chart from that era that I can look at?
Thank you for your time and consideration.
Jeremy
Thank you for your time and consideration.
Jeremy