by neman2
At about 15:45 M427 came back with only the CSX power and about 20-30 cars, so to answer my own question, those engines were not being delivered to the B&E, but were apparently dropped at NC.
Railroad Forums
Moderator: MEC407
Pan Am Southern LLC (“PAS”) submits this Verified Notice of Exemption pursuant to the class exemption at 49 C.F.R. §1180.2(d)(8) for limited overhead temporary trackage rights over a rail line owned by the Boston and Maine Corporation (“B&M”) and leased and operated by Springfield Terminal Railway Company (“ST”), generally between PAS’s existing connection to B&M/ST’s tracks at Engineering Station 215+89 at CPF 312 outside Ayer, Mass. to Engineering Station 225+00 outside Ayer, Mass., a total distance of approximately 1,000 feet (the “B&M/ST Line”). PAS’s use of the B&M/ST Line will be limited to repositioning locomotives. The temporary trackage rights are based on a written agreement and are not filed or sought in a responsive application in a rail consolidation proceeding.