by Bracdude181
See the small thing between the two track machines? That’s what they’ve been ballasting with so far. My dimensions were off. It’s actually kinda small…
Railroad Forums
Moderator: David
Bracdude181 wrote:So are they not gonna use the bridge that’s there? I will say that bridge is questionable. I can see them replacing the tracks though. Last train on that portion was in 2008 with NS 3026 and 8 cars and at that time it was bad enough that they had to absolutely crawl over that stretch.Do you have a fear of bridges? You seem to have a problem with just about every single one of them.
CR7876 wrote:Really wish my old rr.net colleagues were around some days .Bracdude181 wrote:So are they not gonna use the bridge that’s there? I will say that bridge is questionable. I can see them replacing the tracks though. Last train on that portion was in 2008 with NS 3026 and 8 cars and at that time it was bad enough that they had to absolutely crawl over that stretch.Do you have a fear of bridges? You seem to have a problem with just about every single one of them.