by shlustig
Just East of Confluence, PA the B&O double-tracked line has the two tracks on separate rights-of-way for about 5 miles which at one point appear to be a mile or 2 apart.
Are both of these originals, or was one a later realignment? If a later alignment, when was it constructed? Did either one have 2 tracks at one time?
Thanks in advance.
Are both of these originals, or was one a later realignment? If a later alignment, when was it constructed? Did either one have 2 tracks at one time?
Thanks in advance.