  by joesbag
 
This is GREAT news! They can lift the Curriers to North Java portion out of the mud and possibly in the future have special excursions to N. Java again?
  by thebigham
 
^Yes!

Supposedly work will begin in 2018.

I was hoping for this year.
  by thebigham
 
Arcade Herald article
You do not have the required permissions to view the files attached to this post.
  by joesbag
 
Thanks for posting bigham!
  by thebigham
 
The A&A has been brushcutting from Curriers to North Java.

Track rehab will begin next year on this section.

They're really opened up the right of way. I'll take some pictures soon.
  by mkirsch
 
You mean eventually I'll be able to go to Smokey's and not see "squiggletrack?"
  by thebigham
 
The contractor has begun preparations for this rehab.
You do not have the required permissions to view the files attached to this post.
  by joesbag
 
I was just thinking about this today wondering when they might begin. Great News!
  by mkirsch
 
Any word on exactly what type of work will be performed? Obviously new ties, but will rails be replaced? Any grade work, such as along the swamp?
  by BSOR Patarak
 
There was a small section of heavier rail installed north of Curriers. The reflecting pond received a new culvert and was drained considerably. Other culverts were replaced. A lot of ditching is being done on both sides to dry out bad sections. Nearly 2 out of 3 ties were changed out. Ballasting and tamping will commence in the next couple of weeks. A&A crews have been running freight evenings to accommodate the track work.
  by thebigham
 
^Thanks, Pat!

I have to get out this week and take pics.
  by thebigham
 
Pics taken Tuesday June 12, of the rehab between Curriers and North Java.

New ties are in. Ditching completed. Ballasting has begun with tamping to follow.

Pics of the "upper" Rt 98 crossing at Java Center.
You do not have the required permissions to view the files attached to this post.
  by thebigham
 
#112 and #113 took 8 loads to North Java today (July 10) and will have 9 empties for their return train. The contractor for the rehab told me he had 6,000+ bolts to install and that work would be done in 3 weeks.

More rehab pics here:

http://photos.greatrails.net/show/?orde ... e=1&key=33" onclick="window.open(this.href);return false;