csor2010 wrote:Another Plainville note; while I was there the other day it looked like a track crew was working near the Pequabuck River bridge, which as far as I know is the current end of track. Having seen several reports of monster EDPL/PLEDs and with the yard looking increasingly like a switching puzzle, is it possible that PAR is extending the northern yard lead by a bit?
End-of-track goes further, the whole length of the Robertson Airport runway to ~200 ft. shy of the former Northwest Dr. bridge. Haven't crossed the Pequabuck in years and only given it minimal weed-spraying for sake of retaining Robertson's maint access to that side of the security fence. There's also a mostly derelict trackside gravel driveway coming off Northwest Dr. that runs along the final 1750 ft. of track, though they haven't ever had a need to use that for anything.
Ironically, if you switch to Google 2016 view (i.e. turn off 3D view on the menu), you'll see a string of 5 tankers parked within a single car length of the Pequabuck bridge and scattered tie piles running from the switch all the way to the bridge footings. Looks like they've been incrementally rehabbing the lead for some months now. Maybe they're getting ready to cross the bridge? They only have 1500 ft. of runaround from last switch to the bridge, so it'll only take a few more cars on those oversize EDPL's before they have legitimate need to tap the slack space next to Robertson.