From the CDOT website about the status of the Independent Wheel Truing (IWT) Facility:
Project Description:
This Independent Wheel Truing (IWT) facility is for re-profiling the steel wheels on the new and
existing New Haven Line and Shore Line East rolling stock. This re-profiling consists of milling the
wheels to restore wheel diameter parity and profile as a result of the stresses of track wear, drift,
spalling and wheel flat spots. The wheel machine is an under-floor tandem type machine which can
true both axles on a truck at the same time as vehicles are pulled over the machine for ease of
operation and to speed turnaround time. The building encloses the machine pit on a single track and
includes extensions to house a pair of cars indoors at both ends of the facility.
Project Milestones:
The construction Baseline Schedule is being finalized. The anticipated milestones are as follows:
Milestone Expected Schedule
Phase I Parking/Utilities Complete December 15, 2011
Building Shell Complete October 10, 2012
Commissioning Complete March 12, 2013
Construction Complete April 12, 2013
Equip. Move and Operational June 10, 2013
Major components completed to date:
• Supplemental employee parking in yard
• New Phase I Employee Parking Lot
• Underground utility work to support Phase I Parking
• Track 38 crossing
• Pile load testing
• Manufacturing of Wheel Lathe subassemblies by suppliers
• Procurement of foundation piles
Link to CDOT:
http://www.ct.gov/dot/lib/dot/documents ... 4-2012.pdf
  by MNCRR9000
 
http://www.ct.gov/dot/lib/dot/documents ... t_Shop.pdf" onclick="window.open(this.href);return false;

Latest update from Feb 2014 regarding the Component Change Out Shop construction.


http://www.ct.gov/dot/lib/dot/documents ... Y_IWTF.pdf" onclick="window.open(this.href);return false;
Independent Wheel Truing Facility Construction progress.