NBSR 120 was into McAdam @ 04:17 ADT, NBSR/EMR/MNR 64XX/64XX/64XX, 87 mixed freight(5 autoracks), 29 wells, 60 containers(min.).
9 loaded center beams, 9 loaded log cars, and 1 covered hopper are cut from the train. The logs and hopper are likely destined for Woodland, ME. I believe there is a crew change, and at 07:07, the bell tolls, one whistle blow, and NBSR 120 departs McAdam station.
Edited at 22:06 EDT
NBSR 121 was into McAdam @ 20:48 ADT, NBSR/EMR/MNR 64XX/64XX/64XX, 60 mixed freight(13 autoracks), 64 wells, 129 containers(min.).
Last edited by KuBand12 on Wed Sep 25, 2024 9:11 pm, edited 1 time in total.