by Nehahra
117 is out of paint, and ready to ship out tuesday
112 is being prepped for paint.
112 is being prepped for paint.
Railroad Forums
Moderators: metraRI, JamesT4
metraRI wrote:117 arrived at Schiller Park on Saturday, after making a long detour and ending up in Fond du Lac, WI.Weird. I wonder if actually went north first on a CN manifest via Leithon (where the ex-EJ&E meets the Waukesha sub) before being doubled back south again. Couldn't they have just dropped it off in the yard at Antioch?
AMTKHawkeye wrote:Spotted 112 today in the BNSF coach yard, complete with ARRA logos.It looks like every unit completed after 215/216 has the ARRA logo and those before do not.
F40CFan wrote:It looks like every unit completed after 215/216 has the ARRA logo and those before do not.Every unit after 111, numerically, will have the ARRA logo. The rebuilding of 112-149? is being paid for by stimulus money, while 100-111 was out of other funds. 105 was the last to be delivered without the logo.