by Arborwayfan
Likely route for the RDCs from VT to ME? Would they be likely to be delivered in freight trains (can they be set up to run safely as towed cars?) or under their own power? If under their own power, I assume they would require an engineer qualified on the equipment and a pilot qualified on each stretch of track?