Railroad Forums 

Discussion relating to the operations of MTA MetroNorth Railroad including west of Hudson operations and discussion of CtDOT sponsored rail operations such as Shore Line East and the Springfield to New Haven Hartford Line

Moderators: GirlOnTheTrain, nomis, FL9AC, Jeff Smith

 #1371166  by Jeff Smith
 
Good thing it's a Saturday schedule:

from the web:
Special Service Notices

The Lower Level of Grand Central Terminal is temporarily closed until further notice due to the loss of power as a result of a water pipe break. Train service is not affected at this time and is operating to/from the Upper Level of the Terminal.
 #1371253  by DutchRailnut
 
no and everything is back to normal, power is restored and food court open.