New switches I've seen are (working south to north):
Coach Storage Track Switch*
Shop/Interchange switch @ Mill Street
South End of the Arcade Runround @ Mill Street
North End of the Arcade Runround @ Main Street
Northbound trailing-point switch in the new industrial park
All new switches have the appearance of new panel switches being installed: New ties, point rails, new frogs, everything.
*With this switch in place, rebuilding of the wye is a distinct possibility. My thoughts would be to use some of the reipped out switches to restore service on the wye... at least in a temporary/emergency way.
The north end of the runaround was installed on track one, not on track two yet. This required the excursions to depart from track one (the main track). No18 would arrive on track one, tender first. After uncoupling, she backed into the enginehouse leads, while one of the diesels would couple onto the train and pull it back by the sandhouse (or the remains there-of). 18 would then double over to the main, against the excursion train and pull it back up to the station for boarding.
trackwork is proceeding, albeit not as quickly as one would think. Certain aspects are interfering with the excursions, require makeshift fixes until the upgrades are complete. The A&A crews deserve massive kudos for their efforts required to keep the trains running while the work is ongoing.
*Edit: Forgot about the coach switch
------------------------------------(Combining two posts)-----------------------------------
Nessman.. these are just for you!
Sorry about the glare from the switchstand. I hadn't expected the flash to go off.
Unfortunately, this is the only picture of this switch I have... but I think its a good shot anyways.
South end is in service, but as you can see, the north end has a bit of work remaining. What concerns me here, the divegence of track two is MUCH less than it was. With this new switch, the A&A no longer has the ability to use all six coaches in one train. Hopefully, this WILL be a problem in the future.
I included this, showing the staging of materials at the north end of this section of work.
-------------------------Edited to include another Arcade Picture:-----------------------