by EDFLD Bill
Plate C wrote:Was there yesterday, could not make out what is that switch engine down near the shops? Could only see its rear.
Probably the ex-C&C S-4 moving to North Adams.......
EDFLD Bill
Railroad Forums
Moderator: MEC407
Plate C wrote:Was there yesterday, could not make out what is that switch engine down near the shops? Could only see its rear.
GU1001 wrote:Swung by East Deerfield this afternoon. Saw POED? yarding with 3 of the "new" GE's.Yes. That bridge is slated to be fully replaced this year. I believe they will do a singe lane temp bridge (with lights) while they fully remove and replace the original.
Also, there was a pile of road construction signs & barrels along with detour signs piled up in the grassy area to the left of the railfan bridge. I heard talk of bridge reconstruction last year. Maybe it'll start this spring. Anyone have more info?
Xaque wrote:When I was living in Whately, Guilford cleared the entire area west of the bridge with the intention of building a brand-new bridge next to (west) of the existing one in the late 1990s, early 2000s. A portion of River Road/McClelland Farm Road was to be relocated, and possibly a new intersection south of the new bridge. Whether this is still the plan, I don't know.GU1001 wrote:Swung by East Deerfield this afternoon. Saw POED? yarding with 3 of the "new" GE's.Yes. That bridge is slated to be fully replaced this year. I believe they will do a singe lane temp bridge (with lights) while they fully remove and replace the original.
Also, there was a pile of road construction signs & barrels along with detour signs piled up in the grassy area to the left of the railfan bridge. I heard talk of bridge reconstruction last year. Maybe it'll start this spring. Anyone have more info?
GU1001 wrote:Swung by East Deerfield this afternoon. Saw POED? yarding with 3 of the "new" GE's.This is MassDOT project 602320. Here's a link to the project webpage:
Also, there was a pile of road construction signs & barrels along with detour signs piled up in the grassy area to the left of the railfan bridge. I heard talk of bridge reconstruction last year. Maybe it'll start this spring. Anyone have more info?
BenH wrote:Thanks for the reply.GU1001 wrote:Swung by East Deerfield this afternoon. Saw POED? yarding with 3 of the "new" GE's.This is MassDOT project 602320. Here's a link to the project webpage:
Also, there was a pile of road construction signs & barrels along with detour signs piled up in the grassy area to the left of the railfan bridge. I heard talk of bridge reconstruction last year. Maybe it'll start this spring. Anyone have more info?
https://hwy.massdot.state.ma.us/Project ... _NO=602320
Apparently, this project has been on MassDOT's radar since 1997.