by JohnFromJersey
Wolfgang5150 wrote: ↑Thu Oct 13, 2022 2:19 am Seeing all of the talk about Gold Lumber I figure I’d chime in. There was a Southern Pacific boxcar on their siding around October-November 2008. I believe that was the last car to come off of the lead to the lumber yard. Around 2006/2007 I can remember a full train with a csx engine in the bright future paint parked, turned off on the freehold industrial past the Gold lumber switch up until Southard road where the rest of the train was on the other side of the crossing. I thought it was wild how much the train was leaning, just sitting there.How big was a "full train" back then? I remember Gold's siding not being particularly long, so I'll assume that around 12 cars or less was a "full train"
Wolfgang5150 wrote: ↑Thu Oct 13, 2022 2:19 am After the Lumber yard closed, the local riff raff built a pretty impressive skatepark inside the main warehouse, probably made with most of the leftover product on the property. Not too sure what happened when they closed their doors because it seems that they left almost everything in place and just vanished. Still find it interesting that such a big piece of land hasn’t been redeveloped into literally anything elseThe owner of the property is known as a notorious slumlord who lets his property sit until he can get the absolute most money for it. He owns a lot of other properties, especially down the shore, that have similar dilemmas; good real estate/location, but has been empty for quite some time. Rumor has it, he is waiting for someone to approach him with a housing development plan, which sucks since that land would be better off being a train station or some sort of industrial property
Bracdude181 wrote: ↑Fri Oct 14, 2022 9:14 am Has anyone seen the train today? SA31 didn’t do the interchange yesterday.
Bracdude181 wrote: ↑Fri Oct 14, 2022 9:27 am Nope. RB-1 did not run today.I believe this is only the first or second time there has not been a delivery on either a Tuesday or Friday.
CharlieL wrote: ↑Fri Oct 14, 2022 9:50 am That explains the activity in Farmingdale this A.M. Large hi-rail loading ties, looks like to be headed south; also the flatbed they have to haul rail equipment (tracks on bed) sitting, either just unloaded or waiting to pick equipment up. I did not see any new equipment that may have been unloaded.
Bracdude181 wrote: ↑Fri Oct 14, 2022 10:10 am How much rail are they dropping off?So is that why there was no RB-1 today - they are focusing on doing some extensive track work? And quite a lot of rail was dropped off by the Main St crossing, I would say at least a few hundred feet of rail.